Where can I buy the fine stone concrete pump of the automatic fine stone concrete pump? After years of hard work, Talenet has now developed into a company with production and management standards. Company mass production
Fine stone concrete pumps have sufficient inventory to serve the whole country. Courage to innovate and continuous improvement are the essence of corporate culture. We always adhere to the entrepreneurial philosophy of "integrity and cooperation in production, quality management", and provide our customers with good products.
Are you still worrying about finding a good fine stone concrete pump? Don't worry anymore, Talenet will solve your problems about construction machinery and construction machinery. Over the years, our company knows that if we don't want to be eliminated, we can only get ahead. Therefore, we have been committed to the research and development of fine stone concrete pumps. With unremitting efforts, we have finally achieved fruitful results and have been recognized by many users. Product quality and quality are remarkable and reliable.
Full-automatic fine-stone concrete pump, the basic requirements for the safe use of the operation rules for the use of concrete pumps
1. The grounding wire of the motor and the emergency stop switch should be set at the use site.
2. The grid on the hopper is an important part to ensure the machinery and the human body and cannot be removed at will.
3. The connected conveying pipeline must be well supported and fixed. The pump body carries the pipeline and other external forces.
4. The random rubber hose can only be connected to the pouring area at the outlet of the conveying pipe, otherwise it will crack or block the pipe.
5. When other steel pipes or hoses are used to replace the randomly configured pipelines, products with coal safety signs complying with the relevant regulations of coal mines must be used, and their diameters cannot be reduced.
6. The operation and maintenance must be carried out by professionals, and other personnel are not allowed to operate without authorization, so as to avoid injury to persons or machines.
7. When overhauling, adjusting and replacing parts, the host should be turned off, and the switch should be zeroed, locked, and tagged.
8. When replacing the piston, the whole operation process should be carried out by one person alone, and another person should be guarded by the side to give prompts and help confirm, but it is forbidden to participate in the operation. During the entire process of replacing the piston, it is strictly forbidden to reach into the delivery cylinder to avoid accidental injury caused by the movement of the piston.
9. The pressure of the pumping system cannot be greater than 19Mpa, and the pressure of the stirring system cannot be greater than 8Mpa
Two, check before starting
1. Whether the hydraulic oil reaches 3/4 of the oil level gauge. 2. Whether the water tank is filled with clean water.
3. Whether the levers of the pumping and mixing reversing valve are in the middle position, and whether the manual ball valve is in the open state.
Three, pumping concrete
Operating procedures
1. Start the motor and make the oil pump run at no load. If the ambient temperature is low, the idling time should be appropriately extended to increase the temperature of the hydraulic oil above 15°C before pumping.
2. Add a bucket full of clean water to the hopper, and turn on the positive pump to pump the water into the pipeline to moisten the hopper and the conveying pipeline.
3. Start the mixer, add 1-3 buckets of cement mortar to the hopper, and drive the positive pump into the pipeline to lubricate the pipeline.
4. Only after the procedures of items 2 and 3 are completed, can the finished concrete be added to the hopper and enter the normal pumping concrete work, otherwise it will cause pipe blockage. Concrete pump is a very commonly used concrete conveying tool at present, which can greatly improve the conveying efficiency of concrete, so it is welcomed by the majority of construction parties. However, before use, the concrete pump should undergo a series of inspections to ensure the smooth progress of the entire construction process.